Block Fen / Langwood Fen Master Plan Draft SPD Details|Block Fen / Langwood Fen Master Plan Draft SPD
- Description:
- This document provides detailed guidance on the phasing and working of mineral reserves; waste recycling and disposal; enhancement
habitat; water storage; recreation and leisure; traffic; and sustainable use of soils in the Block Fen / Langwood Fen area
of Cambridgeshire.
- Contact Name:
- Cambridgeshire County Council
- Contact Email:
- mwplan@cambridgeshire.gov.uk
- Contact Telephone:
- 01223 715529
- Other Contact Information:
- Development Control, Strategic Planning
Cambridgeshire County Council
Box: CC1213
Shire Hall
Cambridge CB3 0AP
- Subject:
- minerals and waste
|
15/02/10 09:00 |
29/03/10 17:00 |
Closed |
RECAP Waste Management Design Guide Draft SPD Details|RECAP Waste Management Design Guide Draft SPD
- Contact Name:
- Cambridgeshire County Council
- Contact Email:
- mwplan@cambridgeshire.gov.uk
- Contact Telephone:
- 01223715529
- Other Contact Information:
- Development Control, Strategic Planning
Cambridgeshire County Council
Box: CC1213
Shire Hall
Cambridge CB3 0AP
- Subject:
- minerals and waste
|
15/02/10 09:00 |
29/03/10 17:00 |
Closed |
The Location and Design of Waste management Facilities Draft SPD Details|The Location and Design of Waste management Facilities Draft SPD
- Description:
- This document provides detailed guidance on the location and design of waste management facilities, and sets out a series
of development principles based on recognised good planning and good design practice.
- Contact Name:
- Cambridgeshire County Council
- Contact Email:
- mwplan@cambridgeshire.gov.uk
- Contact Telephone:
- 01223 715529
- Other Contact Information:
- Development Control, Strategic Planning
Cambridgeshire County Council
Box: CC1213
Shire Hall
Cambridge CB3 0AP
- Subject:
- minerals and waste
|
15/02/10 09:00 |
29/03/10 17:00 |
Closed |
Minerals and Waste Further Additional Sites Details|Minerals and Waste Further Additional Sites
- Description:
- Further Additional Sites Proposed during Preferred Options 2 Consultation for the Cambridgeshire and Peterborough Minerals
and Waste Plan
|
31/03/09 09:00 |
12/05/09 17:00 |
Closed |
Minerals and Waste Earith Mepal Area Action Plan Preferred Options 2 Details|Minerals and Waste Earith Mepal Area Action Plan Preferred Options 2
- Description:
- This document sets out the Council's preferred options for site specific proposals for future minerals and waste development
and other supporting site specific proposals in the Earith Mepal Area. The plan makes provision to meet, through mineral extraction
and restoration, the strategic need for additional flood alleviation capacity in association with the Ouse Washes. It also
makes provision for other afteruses including habitat creation, recreation and winter water storage.
|
08/09/08 09:00 |
20/10/08 17:00 |
Closed |
MWPO2 Additional Sites Details|MWPO2 Additional Sites
- Description:
- The primary purpose of this Additional Sites document is to present to the statutory bodies and other interested persons,
the 36 additional / amended sites proposed by land owners and developers in response to the Minerals and Waste Preferred Options
2 consultation (8th September - 20th October 2008).
|
26/01/09 09:00 |
09/03/09 17:00 |
Closed |
Minerals and Waste Site Specific Proposals Preferred Options 2 Details|Minerals and Waste Site Specific Proposals Preferred Options 2
- Description:
- This document sets out the Council's preferred options for future minerals and waste development within Cambridgeshire and
Peterborough. It identifies site specific land allocations and other supporting site specific policies.
|
08/09/08 14:41 |
20/10/08 17:00 |
Closed |
Minerals and Waste Core Strategy Preferred Options 2 Details|Minerals and Waste Core Strategy Preferred Options 2
- Description:
- This document sets out the council's vision and objectives for future minerals and waste development. it contains policies
that provide the broad spatial strategy for the provision of new minerals and waste development, core policies setting out
key matters that need to be taken into account
|
08/09/08 09:00 |
20/10/08 17:00 |
Closed |
Minerals and Waste LDF Core Strategy Submission Plan Details|Minerals and Waste LDF Core Strategy Submission Plan
- Description:
- This document sets out the strategic vision and objectives for minerals and waste management to 2026, including three strategic
site allocations. Also contained is a suite of development control policies to guide minerals and waste development decision
taking.
- Contact Name:
- Cambridgeshire County Council
- Contact Email:
- mwplan@cambridgeshire.gov.uk
- Contact Telephone:
- 01223 715529
- Other Contact Information:
- Development Control, Strategic Planning
Cambridgeshire County Council
Box: CC1213
Shire Hall
Cambridge CB3 0AP
- Subject:
- minerals and waste
|
15/02/10 09:00 |
29/03/10 17:00 |
Closed |
Minerals and Waste LDF Site Specific Proposals DPD Submission Plan Details|Minerals and Waste LDF Site Specific Proposals DPD Submission Plan
- Contact Name:
- Cambridgeshire County Council
- Contact Email:
- mwplan@cambridgeshire.gov.uk
- Contact Telephone:
- 01223 715529
- Other Contact Information:
- Development Control, Strategic Planning
Cambridgeshire County Council
Box: CC1213
Shire Hall
Cambridge CB3 0AP
- Subject:
- minerals and waste
|
15/02/10 09:00 |
29/03/10 17:00 |
Closed |
Minerals And Waste Core Strategy (DPD) Preferred Options Details|Minerals And Waste Core Strategy (DPD) Preferred Options
- Description:
- The Core Strategy document for the 2006 Minerals and Waste Consulttion
|
06/11/06 00:00 |
18/12/06 00:00 |
Closed |
Habitats Regulations Assessment: Scoping Report for the Core Strategy Details|Habitats Regulations Assessment: Scoping Report for the Core Strategy
- Description:
- this document provides the screening report of the Habitat Regulations Assessment of the Core Strategy
|
08/09/08 09:00 |
20/10/08 17:00 |
Closed |
Habitats Regulations Assessment: Scoping Report for the Earith / Mepal Area Action Plan Details|Habitats Regulations Assessment: Scoping Report for the Earith / Mepal Area Action Plan
- Description:
- This document provides the screening report of the Habitat Regulations Assessment of the Earith Mepal Area Action Plan
|
08/09/08 09:00 |
20/10/08 17:00 |
Closed |
Habitats Regulations Assessment: Scoping Report for the Site Specific Plan Details|Habitats Regulations Assessment: Scoping Report for the Site Specific Plan
- Description:
- This document provides the screening report of the Habitat Regulations Assessment of the Site Specific Proposals
|
08/09/08 09:00 |
20/10/08 17:00 |
Closed |
| Minerals and Waste Site Specific Proposals (DPD) Preferred Options Details|Minerals and Waste Site Specific Proposals (DPD) Preferred Options
|
06/11/06 00:00 |
18/12/06 00:00 |
Closed |